White-Label Integration
Goal: Ship a proven template with minimal engineering and branding effort.
5. Firmware package
4. QA & certification
3. Brand styling
  1. HW matching
  1. Template selection
Standard OEM Integration
Goal: Fast adaptation of Actogram firmware to an existing quartz/LCD watch with a pedometer.
5. Mass production
4. Validation
3. UI alignment
  1. Firmware porting
  1. Technical briefing
  1. T0 — Technical Briefing & HW Audit
  2. T1 — Firmware Porting & HAL Adapters
  3. T2 — UI Alignment
  4. T3 — Device Validation
  5. T4 — Release to Manufacturing
Milestones
Deliverables
  • HW compatibility report; risk register
  • Firmware build (alpha → RC) + change log
  • UI guideline pack (light/dark, low‑power, error states)
  • Test plan + QA logs (functional, performance, battery)
  • Manufacturing package (image, flashing SOP, roll‑out checklist)
KPIs
  • Porting lead time ≤ 4–6 weeks
  • Battery impact ≤ +1.0%/24h vs. baseline
  • Crash rate ≤ 0.1%/1k device‑days
  • Step‑data availability ≥ 99%
  • Render/refresh within budget
Acceptance Criteria
  • 100% of mandatory functional tests pass on 3 SKUs
  • 48‑hour endurance: 0 critical defects; ≤ 2 minor
  • Footprint within cap (e.g. ≤ 64 KB flash / ≤ 8 KB RAM)
  • Battery delta verified within KPI
  • Flashing succeeds on N=20 pilot units; 0 bricked
  1. Template Selection
  2. HW Matching
  3. Branding
  4. QA & Certification
  5. Package Delivery
Milestones
Deliverables
  • Template spec; delta list vs. default
  • Signed one‑click firmware build + notes
  • Brand token file (colors, logo, type scale)
  • QA summary (pass/fail matrix, battery)
  • Quick start + support window
KPIs
  • Setup‑to‑release ≤ 2–3 weeks
  • Smoke test pass rate ≥ 98%
  • Battery delta ≤ +0.8%/24h
  • Issue TTR < 2 business days
Acceptance Criteria
  • Pixel‑perfect render on all target resolutions
  • 0 P0 defects; ≤ 3 cosmetic P2/P3 accepted
  • Signed image loads on pilot batch with 0 failures
  • Final checklist signed by both parties
Disclaimer:
All project details are indicative and not a public offer. Final terms and specifications are subject to mutual agreement.